Winifred Waste Water System Improvements

(water, wastewater)

​

The project work for this $1.3 Million sewer system rehabilitation project includes Preliminary Engineering Report, funding coordination, design permitting, and other miscellaneous projects management.

​

The system consists of +/-12,950 LF of primarily 8" VCP pipe, with 45 concrete manholes. Another 550 LF of 10" transit sewer outfall pipe exists up gradient from the lagoon influent manhole.

​

The Phase II project will consist of a new wastewater treatment (facultative lagoon) system, followed by discharge/disposal that will be designed and constructed in strict accordance with MT DEQ Standards.